Project Title
EGMCL Unit 7 – BIM Coordination & MEP Integration

Architectural Model
Overview
The EGMCL Unit 7 project for Epic Garments Manufacturing Company Ltd., located at Plots 265, 266, 271 & 272, Adamjee Export Processing Zone, Narayanganj, Bangladesh, consists of a 350,000 sq. ft. industrial facility designed to support large-scale apparel manufacturing operations.
From 2022 to 2023, a comprehensive Building Information Modeling (BIM) workflow was implemented, delivering an integrated LOD 300 model for architectural, structural, and MEP disciplines. The scope included detailed hanger system design and full MEP coordination, covering:
1. HVAC Systems
2. Electrical Distribution
3. Fire Safety Systems
4. Plumbing & Drainage
5. Steam Distribution Network
6. Compressed Air Systems
The coordinated BIM model ensured clash resolution, improved construction sequencing, and provided the client with a reliable digital foundation for execution and future facility management.
The EGMCL Unit 7 project for Epic Garments Manufacturing Company Ltd., located at Plots 265, 266, 271 & 272, Adamjee Export Processing Zone, Narayanganj, Bangladesh, consists of a 350,000 sq. ft. industrial facility designed to support large-scale apparel manufacturing operations.
Services We Designed

HVAC

Electrical

Fire Protection

Plumbing

Steam Distribution

Compressed Air
Image Gallery








Services We Designed

HVAC

Electrical

Fire Protection

Plumbing

Steam Distribution

Compressed Air
BIM Benefits
Multi-Disciplinary Integration
All design teams (architectural, structural, MEP) work inside one unified model. Zero miscommunication. Zero surprises during construction.
Early Clash Prevention
We detect conflicts between ducts, beams, pipes, cables & walls long before construction. No rework. No downtime. No costly mistakes.
Real-Time Coordination
Any design change updates across all drawings and systems instantly. No out-dated plans. No waiting for revisions.
Accurate Cost Insights
Our data-driven model gives exact quantities, material lists & cost estimation early on. Avoid budget shocks. Plan procurement with confidence.
Multi-Disciplinary Integration
All design teams (architectural, structural, MEP) work inside one unified model. Zero miscommunication. Zero surprises during construction.
Early Clash Prevention
We detect conflicts between ducts, beams, pipes, cables & walls long before construction. No rework. No downtime. No costly mistakes.
Real-Time Coordination
Any design change updates across all drawings and systems instantly. No out-dated plans. No waiting for revisions.
Accurate Cost Insights
Our data-driven model gives exact quantities, material lists & cost estimation early on. Avoid budget shocks. Plan procurement with confidence.
Image Gallery








