Project Title
BRB Selima Medical College Hospital– BIM Coordination & MEP Integration

Architectural Model
Overview
The BRB Selima Medical College Hospital project, developed by BRB Cables in Kushtia, Bangladesh, comprises a 740,000 sq. ft. healthcare facility designed to accommodate advanced medical, academic, and patient-care functions.
Between 2019 and 2020, a full Building Information Modeling (BIM) workflow was implemented, delivering an integrated LOD 200 model for architectural, structural, and MEP disciplines. The scope included multidisciplinary coordination across essential hospital systems, covering:
1. HVAC Systems
2. Electrical Power & Lighting
3. Fire Safety & Detection
4. Plumbing & Sanitary Systems
5. Medical Gas Distribution
The coordinated BIM environment improved design clarity, supported resolution of system conflicts early in the design phase, and provided a reliable digital model tailored for hospital-grade engineering and planning.
The BRB Selima Medical College Hospital project, developed by BRB Cables in Kushtia, Bangladesh, comprises a 740,000 sq. ft. healthcare facility designed to accommodate advanced medical, academic, and patient-care functions.
Services We Designed

HVAC

Electrical

Fire Protection

Plumbing

Steam Distribution

Compressed Air
Image Gallery








Services We Designed

HVAC

Electrical

Fire Protection

Plumbing

Steam Distribution

Compressed Air
BIM Benefits
Multi-Disciplinary Integration
All design teams (architectural, structural, MEP) work inside one unified model. Zero miscommunication. Zero surprises during construction.
Early Clash Prevention
We detect conflicts between ducts, beams, pipes, cables & walls long before construction. No rework. No downtime. No costly mistakes.
Real-Time Coordination
Any design change updates across all drawings and systems instantly. No out-dated plans. No waiting for revisions.
Accurate Cost Insights
Our data-driven model gives exact quantities, material lists & cost estimation early on. Avoid budget shocks. Plan procurement with confidence.
Multi-Disciplinary Integration
All design teams (architectural, structural, MEP) work inside one unified model. Zero miscommunication. Zero surprises during construction.
Early Clash Prevention
We detect conflicts between ducts, beams, pipes, cables & walls long before construction. No rework. No downtime. No costly mistakes.
Real-Time Coordination
Any design change updates across all drawings and systems instantly. No out-dated plans. No waiting for revisions.
Accurate Cost Insights
Our data-driven model gives exact quantities, material lists & cost estimation early on. Avoid budget shocks. Plan procurement with confidence.
Image Gallery








